Delivering Infrastructure

Soma Enterprise Ltd. - Government's trusted partner in developing critical Infrastructure projects of the country for over 20 years

Energy

And that's where Soma, with its proven track record in infrastructure development, steps in to change the landscape of the present and future energy requirements. India's energy requirement is growing exponentially and the need to find a solution is more pressing than ever before.

To meet the projected power requirement by 2012, an additional capacity addition of 100000 MW is required in the next two five year plans. Soma with its proven track record and technical expertise is making sure that it will play a lead role in reshaping India’s energy infrastructure landscape. Soma’s extensive experience in constructing Hydro Power projects has led it to venture into operating and managing Energy projects for the country.

Property

Subansiri Hydro Electric Project (2000 MW)

The Subansiri Lower Hydro Electric Project (2000 MW) consists of 127 M high & 283 M length Concrete Gravity Dam on Subansiri River with 9 Spillways. River diversion is planned by construction of 5 nos of diversion tunnels of 9.5 M dia, each of 600 M average length.

Property

Koyna Head Race Tunnel

The Koyna Hydroelectric Project is the largest completed hydroelectric power plant in India. Our scope comprises of construction of 3.345 Km of tunnel having 9.5 M finished diameter.

Property

Parbati Head Race Tunnel

Parbati Hydroelectric Project (Stage-II) is proposed to generate 800 MW power. The river is proposed to be diverted through 31.52 Km long Head Race Tunnel, of which we constructed 5.21 Kms of tunnel with 6 M finished diameter.

Property

Diversion Tunnels in Teesta HE Project

Teesta Hydro Power Station (3x170 MW), stage V, is located in the state of Sikkim. The project comprises of 88.6 M high Concrete Gravity Dam and has 17.2 Km long Head Race Tunnel. River diversion is planned by construction of 2 nos of diversion tunnels of 12.2 M dia, each of 1100 M average length.

Property

Ranganadi Main Tunnel

RANGANADI HYDRO ELECTRIC PLANT a 405 MW capacity plant located in the Lower Subansiri District of the State of Arunachal Pradesh. Out of 10.13 Km long tunnel, the company executed 6.65 Kms of tunnel having 6.8 M finished diameter.

Property

Strengthening of koyna Dam

The work involves strengthening of Dam overflow portion by concreting in layers of 1.5m lift. Length of Dam is 807.2m and height is 103m