Water resources are natural resources of water that are potentially useful. Uses of water include agricultural, industrial, household, recreational and environmental activities. All living things require water to grow and reproduce.
The project involves Construction of Tunnel having finished dia of 5.5 M and length of 6.657 Km using Tunnel Boring machine (TBM) from Gundovli to Kapurbawdi under package MVP – 16, MCGM, Mumbai. The scope includes construction of Inlet shaft & Outlet Shaft having finished dia of 11.00 M and depth 112.035 M.
The project involves Construction of main irrigation canal of 33.50 Km and distributary irrigation canal of 15 Km including construction of 2 No’s Tunnels (1.30 Km & 0.4 Km) long in Canal Alignment in Mongra, Chattisharh
19.05 TMC storage water reservoir, 40km length irrigation canals, Roller Compacted Concrete Dams
The project involves Excavation of 26kms of Canal including Lining of Entire Canal, construction of CD works of Polavaram Project Left Main Canal having bed width as 70 M and 17.23 M as depth of canal and is executed under Indira Sagar Project (Polavaram Project) - Package 2 on EPC Turnkey System
The project involves Excavation of 14.80 Kms of Canal including Lining of Entire Canal, construction of CD works of Polavaram Project Right Main Canal having bed width as 86 M and 30 M as depth of canal and is executed under Indira Sagar Project (Polavaram Project) - Package 1 on EPC Turnkey System.
The project involves Construction of Prakasha Barrage, in Nandurbardist,Maharastra.The height of the barrage is 20.50 M, the length is 503 M and has 27 Nos Vertical Gates of size 15 M x 9 M
The project involves Construction of RCC (Roller Compacted Concrete) Dam across Vaitarna River under Water Supply Projectpackage MVP–1, MCGM, Mumbai.The Dam is 102.40 M High, 573 M Long and 90 M Wide. It is Second Largest RCC Dam in India and is the 9th quickest to be built as per ICOLD Certification.
The project involves Construction of Barrage across Wainganga River for Dhapewada Lift Irrigation Scheme Stage – II. The Height of Barrage is 33 M, the Length is 413 M and has 23 Nos Vertical Gates of size 15.00 M x 8.50 M. It has storage capacity of 1.5 TMC.
The project involves Construction of Digras High Level Barrage in Parbhani dist, Maharashtra. The Height of Barrage is 33.745 M, the Length is 257 M and has 14 Nos Vertical Gates of size 15 M x 11 M. It has storage capacity of 63.85 MM3.
The project involves Construction of Babhali Barrage in Nanded dist, Maharashtra. The Height of Barrage is 30.74 M, the Length is 255 M and has 14 Nos Vertical Gates of size 15 M x 11 M. It has storage capacity of 2.74 TMC
The project involves Construction of Concrete Barrage including Supply and Installation of 10 Nos Radial Gates of size 14.50 M x 8.85 M for Mongra Barrage. The length of the barrage is 182.025 M with storage capacity of 40.15 M cumec.
The project involves construction of Bhosa-Khind Tunnel of length 16.31 Kms and finished dia of 4.60 M in Ahmednagar dist, Maharastra